Current projects & bidding

Partnership begins long before your project breaks ground. Our pre-construction plan room is where you can communicate with the team, view drawings, order prints, and upload files — anytime, anywhere. 

Create an Account

  • This field is for validation purposes and should be left unchanged.
All Projects
My Projects
View Archived Bids
PROJECT OWNER: Sundance Design Build
Towns at Misty Mountain
BID CLOSING DATE
May 3, 2024
Follow Plan

Sitework and site concrete for new subdivision

Estimator - Chris Dunnam:
cdunnam@vacivilconcrete.com
PM Assistant - Kristie Brooks:
kbrooks@vacivilconcrete.com
PROJECT OWNER: Horizon Behavioral Health
Horizon Crisis Receiving Center
BID CLOSING DATE
May 7, 2024
Follow Plan

Sitework including:

E&S, Storm & Sanitary Sewer, Domestic Water & Fire, Site Concrete

Plans & Drawings
Project Manual
Specs
Addendum
Lead Estimator - Chris Dunnam:
cdunnam@vacivilconcrete.com
PM Assistant - Kristie Brooks:
kbrooks@vacivilconcrete.com
PROJECT OWNER: Town of Altavista
Altavista WTP Solids Treatment Systems
BID CLOSING DATE
May 30, 2024
Follow Plan

• Replacement of Sluice and Stop Gates
• Replacement of Flocculator Mixer Motors
• Installation of Flocculator Mixer VFDs
• Installation of Automated Partial Sludge Removal System
• Installation of Chlorine Analyzer System
• Replacement of Sedimentation Basin Stilling Walls
• Repairs to Sedimentation Basin Concrete
• Application of Sedimentation Basin Coating System
• Installation of Mud Valve in cross-over line between Sedimentation Basins 2 and 3 Effluent Flume
• Lighting upgrade to Sedimentation Basins
• Installation of reinforced concrete false bottoms to mid-basins
• Installation of Metal Stairs, Handrails, Toe Plates
• Upgrade to SCADA system
• Replacement of Solids Collection Tank Pump and Controls
• Addition of Solids Collection Tank Emergency Pump Connection
• Replacement of Solids Collection Tank Overflow Piping
• Installation of Solids Collection Tank Controls Shelter

Project Manual
Plans & Drawings