Current projects & bidding

Partnership begins long before your project breaks ground. Our pre-construction plan room is where you can communicate with the team, view drawings, order prints, and upload files — anytime, anywhere. 

Create an Account

  • This field is for validation purposes and should be left unchanged.
All Projects
My Projects
View Archived Bids
PROJECT OWNER: Town of Farmville
Town of Farmville WTP – Potassium Permanganate Treatment Plant
BID CLOSING DATE
Apr 10, 2024
Follow Plan

The construction of a 125,000 gallons concrete tank with 10 Hp floating
mechanical mixer to provide additional time and mixing of Potassium
Permanganate ejected at the Raw Water Intake. To connect the new tank
into the system, will require cutting into the existing 16-inch raw water
pressure main. Also, there will be 12-inch DIP overflow/drain line and a
Rate of Flow Control Valve and actuator plus electrical work for
energizing the mixer and actuator.

Project Manual with Addenda 1-3
Plans & Drawings with Addenda 1-3
Spec Sections
Addendum 1
Addendum 2
Addendum 3
Project Manager:
rjennings@andersonconst.com
Project Manager:
arogers@andersonconst.com
Concrete Estimator - Chris Dunnam:
cdumman@vacivilconcrete.com
Concrete Assistant - Kristie Brooks:
kbrooks@vacivilconcrete.com